ConEd Oil-O-Static Pipelines
C.A.C. had a 3-year contract to work for Con Edison on oil-o-static pipelines within the 5 boroughs. The work included excavation, sheeting, welding, building of structures, and working in Con-Ed substations. This was an emergency contract that included 24-hour service to support burn-outs, leaks, and faults.